Loading...

Loading, please wait...

Back

Power Systems
Power System Generation
Economic Power Generation

Questions mapped to Economic Power Generation under Power System Generation.

2
Total
0
Attempted
0%
0
Correct
0%
0
Incorrect
0%
Q#1 Power System Generation GATE EE 1999 (Set 1) MCQ +2 marks -0.66 marks

An industrial consumer has a daily load pattern of
2000 kW, 0.8 lag for 12 hours, and 1000 kW UPF for 12 hours. The load factor is:

0.5

0.75

0.6

2.0

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Q#2 Power System Generation GATE EE 1995 (Set 1) MCQ +1 mark -0.33 marks

In order to have a lower cost of electrical energy generation,

The load factor and diversity factor should be low

The load factor should be low but diversity factor should be high

The load factor should be high but diversity factor should be low

The load factor and diversity factor should be high

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock