Loading...

Loading, please wait...

Back

Power Systems
Fault Analysis
Zbus Based Fault Analysis

Questions mapped to Zbus Based Fault Analysis under Fault Analysis.

4
Total
0
Attempted
0%
0
Correct
0%
0
Incorrect
0%
Q#1 Fault Analysis GATE EE 2025 (Set 1) NAT +1 mark -0 marks

The bus impedance matrix of a 3-bus system (in pu) is

 

A symmetrical fault (through a fault impedance of  ) occurs at bus 2. Neglecting pre-fault loading conditions, the voltage at bus 1 , during the fault is __________ pu (round off to three decimal places).

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Q#2 Fault Analysis GATE EE 2006 (Set 1) MCQ +2 marks -0.66 marks

For a power system and admittance and impedance matrices for the fault studies are a follows:

The pre fault voltages are 1.0 p.u at all the buses. The system was unloaded prior to the fault.  A solid 3 phase fault takes place at bus 2.                

The post fault voltages at buses 1 and 3 in per unit respectively are

0.24, 0.63

0.31, 0.76

0.33, 0.67

0.67, 0.33

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Q#3 Fault Analysis GATE EE 2006 (Set 1) MCQ +2 marks -0.66 marks

For a power system and admittance and impedance matrices for the fault studies are a follows:

The pre fault voltages are 1.0 p.u at all the buses. The system was unloaded prior to the fault.  A solid 3 phase fault takes place at bus 2.               
The per unit fault feeds from generators connected to buses 1 and 2 respectively are

1.20, 2.51

1.55, 2.61

1.66, 2.50

5.00, 2.50

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Q#4 Fault Analysis GATE EE 2000 (Set 1) NAT +2 marks -0 marks

For the configuration shown in figure, the breaker connecting a large system to bus 2 is initially open. The system 3-phase fault level at bus-3 under this condition is not known. After closing the system breaker, the 3-phase fault level at bus 1 was found to be 5 p.u. What will be the new 3-phase fault level at system bus 3 after the interconnection? All unit values are on common bases. Per fault load current are neglected and pre fault voltages are assumed to be 1.0 p.u. at all buses.

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock