Q#1 Load Flow Analysis GATE EE 2015 MCQ +1 mark -0.33 marks

A 3-bus power system network consists of 3 transmission lines. The bus admittance matrix of the uncompensated system is

 

If the shunt capacitance of all transmission lines is 50% compensated, the imaginary part of the  row  column element (in pu) of the bus admittance matrix after compensation is

–j7.0

–j8.5

–j7.5

–j9.0

Explanation Locked!

Unlock this branch to view the explanation, track, bookmark and more.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 259 0 0
Signals and Systems 164 0 0
Control Systems 201 0 0
Analog Electronics 180 0 0
Digital Electronics 148 0 0
Electrical Machines 390 0 0
Power Electronics 237 0 0
Power Systems 343 0 0
EMFT EE 9 0 0
Measurement 152 0 0
Engineering Mathematics 225 0 0
General Aptitude 206 0 0