Loading...

Loading, please wait...

ExamDost
Learning Portal

Practice over 1000+ GATE-level questions from this topic!

Designed to match the latest GATE pattern with topic-wise precision, difficulty tagging, and detailed solutions.

Q#1 Transmission and Distribution GATE EE 2003 MCQ +2 marks -0.66 marks

A 3-phase, 11-kV generator feeds power to a constant power unity power factor load of 100 MW through a 3-phase transmission line. The line-to-line voltage at the terminals of the machine is maintained constant at 11 kV. The per unit positive sequence impedance of the line based on 100 MVA and 11 kV is j 0.2.  The line-to-line voltage at the load terminals is measured to be less than 11 kV.  The total reactive power to be injected at the terminals of the load to increase the line-to-line voltage at the load terminals to 11 kV is

100 MVAR

10.1 MVAR

−100 MVAR

−10.1 MVAR

Explanation Locked!

Unlock this branch to view the explanation, track, bookmark and more.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 259 0 0
Signals and Systems 164 0 0
Control Systems 201 0 0
Analog Electronics 180 0 0
Digital Electronics 148 0 0
Electrical Machines 390 0 0
Power Electronics 237 0 0
Power Systems 343 0 0
EMFT EE 9 0 0
Measurement 152 0 0
Engineering Mathematics 225 0 0
General Aptitude 206 0 0