Q#1 Power System Stability GATE EE 2012 MCQ +2 marks -0.66 marks

A cylindrical rotor generator delivers 0.5pu power in the steady state to an infinite bus through a transmission line of reactance 0.5pu. The generator no-load voltage is 1.5pu and the infinite bus voltage is 1pu. The inertia constant of the generator is 5 MW-s/MVA and the generator reactance is 1pu. The critical clearing angle, in degrees, for a three-phase dead short circuit fault at the generator terminal is

53.5

60.2

70.8

79.6

Explanation Locked!

Unlock this branch to view the explanation, track, bookmark and more.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 259 0 0
Signals and Systems 164 0 0
Control Systems 201 0 0
Analog Electronics 180 0 0
Digital Electronics 148 0 0
Electrical Machines 390 0 0
Power Electronics 237 0 0
Power Systems 343 0 0
EMFT EE 9 0 0
Measurement 152 0 0
Engineering Mathematics 225 0 0
General Aptitude 206 0 0