Q#1 Power System Stability GATE EE 2012 MCQ +2 marks -0.66 marks

A cylindrical rotor generator delivers 0.5pu power in the steady state to an infinite bus through a transmission line of reactance 0.5pu. The generator no-load voltage is 1.5pu and the infinite bus voltage is 1pu. The inertia constant of the generator is 5 MW-s/MVA and the generator reactance is 1pu. The critical clearing angle, in degrees, for a three-phase dead short circuit fault at the generator terminal is

53.5

60.2

70.8

79.6

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 268 0 0
Signals and Systems 168 0 0
Control Systems 262 0 0
Analog Electronics 186 0 0
Digital Electronics 150 0 0
Electrical Machines 399 0 0
Power Electronics 243 0 0
Power Systems 350 0 0
EMFT EE 111 0 0
Measurement 160 0 0
Engineering Mathematics 236 0 0
General Aptitude 221 0 0