Loading...

Loading, please wait...

ExamDost
Learning Portal
Prep plan My packages

Practice over 1000+ GATE-level questions from this topic!

Designed to match the latest GATE pattern with topic-wise precision, difficulty tagging, and detailed solutions.

Q#1 Transmission and Distribution GATE EE 2017 MCQ +2 marks -0.66 marks

A load is supplied by a 230 V, 50 Hz source. The active power P and the reactive power Q consumed by the load are such that .and A capacitor connected across the load for power factor correction generates 1 kVAR reactive power. The worst case power factor after power factor correction is

0.447 lag

0.707 lag

0.894 lag

1

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 268 0 0
Signals and Systems 168 0 0
Control Systems 262 0 0
Analog Electronics 186 0 0
Digital Electronics 150 0 0
Electrical Machines 399 0 0
Power Electronics 243 0 0
Power Systems 350 0 0
EMFT EE 111 0 0
Measurement 160 0 0
Engineering Mathematics 236 0 0
General Aptitude 221 0 0