Q#1 Power System Protection GATE EE 2008 MCQ +2 marks -0.66 marks

A lossless single machine infinite bus power system is shown below:

The synchronous generator transfers 1.0 per unit of power to the infinite bus. The critical clearing time of circuit breaker is 0.28s. If another identical synchronous generator is connected in parallel to the existing generator and each generator is scheduled to supply 0.5 per unit of power, then the critical clearing time of the circuit breaker will

 

Reduce to 0.14 s  

Reduce but will be more than 0.14 s

Remain constant at 0.28 s

Increase beyond 0.28 s

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 268 0 0
Signals and Systems 168 0 0
Control Systems 262 0 0
Analog Electronics 186 0 0
Digital Electronics 150 0 0
Electrical Machines 399 0 0
Power Electronics 243 0 0
Power Systems 350 0 0
EMFT EE 111 0 0
Measurement 160 0 0
Engineering Mathematics 236 0 0
General Aptitude 221 0 0