Loading...

Loading, please wait...

ExamDost
Learning Portal
Prep plan My packages

Practice over 1000+ GATE-level questions from this topic!

Designed to match the latest GATE pattern with topic-wise precision, difficulty tagging, and detailed solutions.

Q#1 Load Flow Analysis GATE EE 2002 MCQ +2 marks -0.66 marks

A power system consists of 2 areas (Area 1 and Area 2) connected by a single tie line (Figure). It is required to carry out a load flow study on this system. While entering the network data, the tie-line data (connectivity and parameters) is inadvertently left out. If the load flow program is run with this incomplete data

The load-flow will converge only if the slack bus is specified in Area 1

The load-flow will converge only if the slack bus is specified in Area 2

The load-flow will converge if the slack bus is specified in either Area 1 or Area 2

The load-flow will not converge if only one slack bus is specified.

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 268 0 0
Signals and Systems 168 0 0
Control Systems 262 0 0
Analog Electronics 186 0 0
Digital Electronics 150 0 0
Electrical Machines 399 0 0
Power Electronics 243 0 0
Power Systems 350 0 0
EMFT EE 111 0 0
Measurement 160 0 0
Engineering Mathematics 236 0 0
General Aptitude 221 0 0