Q#1 Load Flow Analysis GATE EE 2002 MCQ +2 marks -0.66 marks

A power system consists of 2 areas (Area 1 and Area 2) connected by a single tie line (Figure). It is required to carry out a load flow study on this system. While entering the network data, the tie-line data (connectivity and parameters) is inadvertently left out. If the load flow program is run with this incomplete data

The load-flow will converge only if the slack bus is specified in Area 1

The load-flow will converge only if the slack bus is specified in Area 2

The load-flow will converge if the slack bus is specified in either Area 1 or Area 2

The load-flow will not converge if only one slack bus is specified.

Explanation Locked!

Unlock this branch to view the explanation, track, bookmark and more.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 259 0 0
Signals and Systems 164 0 0
Control Systems 201 0 0
Analog Electronics 180 0 0
Digital Electronics 148 0 0
Electrical Machines 390 0 0
Power Electronics 237 0 0
Power Systems 343 0 0
EMFT EE 9 0 0
Measurement 152 0 0
Engineering Mathematics 225 0 0
General Aptitude 206 0 0