Loading...

Loading, please wait...

ExamDost
Learning Portal
Prep plan My packages

Practice over 1000+ GATE-level questions from this topic!

Designed to match the latest GATE pattern with topic-wise precision, difficulty tagging, and detailed solutions.

Q#1 Economic Load Dispatch GATE EE 2001 MCQ +2 marks -0.66 marks

A power system has two generators with the following cost curves: 

Generator 1:   (Thousand Rupees/Hour)

Generator 2:  (Thousand Rupees/Hour)

The generator limits are

A load demand of 600 MW is supplied by the generators in an optimal manner. Neglecting losses in the transmission network, determine the optimal generation of each generator.

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 268 0 0
Signals and Systems 168 0 0
Control Systems 262 0 0
Analog Electronics 186 0 0
Digital Electronics 150 0 0
Electrical Machines 399 0 0
Power Electronics 243 0 0
Power Systems 350 0 0
EMFT EE 111 0 0
Measurement 160 0 0
Engineering Mathematics 236 0 0
General Aptitude 221 0 0