Q#1 Economic Load Dispatch GATE EE 2012 MCQ +1 mark -0.33 marks

The figure shows a two-generator system supplying a load of, connected at bus 2.         

The fuel cost of generators  and  are:

and and he loss in the line is, where the loss coefficient is specified in p.u on a 100MVA base. The most economic power generation schedule in MW is

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 268 0 0
Signals and Systems 168 0 0
Control Systems 262 0 0
Analog Electronics 186 0 0
Digital Electronics 150 0 0
Electrical Machines 399 0 0
Power Electronics 243 0 0
Power Systems 350 0 0
EMFT EE 111 0 0
Measurement 160 0 0
Engineering Mathematics 236 0 0
General Aptitude 221 0 0