Q#1 Economic Load Dispatch GATE EE 2015 NAT +2 marks -0 marks

The incremental costs (in Rupees/MWh) of operating two generating units are functions of their respective powers  and  in MW, are given by         

 

where,   

For a certain load demand, and  have been chosen such that Rs/MWh and Rs/MWh. If the generations are rescheduled to minimize the total cost, then  is__________.

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 268 0 0
Signals and Systems 168 0 0
Control Systems 262 0 0
Analog Electronics 186 0 0
Digital Electronics 150 0 0
Electrical Machines 399 0 0
Power Electronics 243 0 0
Power Systems 350 0 0
EMFT EE 111 0 0
Measurement 160 0 0
Engineering Mathematics 236 0 0
General Aptitude 221 0 0