Loading...

Loading, please wait...

ExamDost
Learning Portal

Practice over 1000+ GATE-level questions from this topic!

Designed to match the latest GATE pattern with topic-wise precision, difficulty tagging, and detailed solutions.

Q#1 Fault Analysis GATE EE 2011 MCQ +2 marks -0.66 marks

Two generator units G1 and G2 are connected by 15kV line with a bus at the mid-point as shown below.

G1 = 250MVA, 15kV, positive sequence reactance X = 25% on its own base G2 = 100MVA, 15kV,  positive sequence reactance X for the line = 0.225

For the above system, the positive sequence diagram with the p.u. values of the 100MVA common base is

Explanation Locked!

Unlock this branch to view the explanation, track, bookmark and more.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 259 0 0
Signals and Systems 164 0 0
Control Systems 201 0 0
Analog Electronics 180 0 0
Digital Electronics 148 0 0
Electrical Machines 390 0 0
Power Electronics 237 0 0
Power Systems 343 0 0
EMFT EE 9 0 0
Measurement 152 0 0
Engineering Mathematics 225 0 0
General Aptitude 206 0 0